Phase 04 weeks · 1 report + 16 documents
Agreement and procurement basis
- F0_01THE PHASE'S REPORTFee proposal and consultancy agreement under ABR 18Steps, phase allocation, list of deliverables and the agreement with appendices 1–5 — including access to documents and e-invoicing.
- F0_02Procurement clarificationBasis for the contracting authority's own assessment of the route — below DKK 500,000, section 193 or EU tender.
- F0_04ESPD and declaration of impartialitySelf-declaration and impartiality — the first of three times in the process.
- F0_06Sustainability agreementLevel D, C, B or A — and what each level costs and requires.
- F0_07Data processing agreementProcessing of personal data in the case under GDPR article 28.
- F0_09E-invoicing basisEAN, requisition number and payment plan — so the first invoice is not rejected.
- F0_13Project data sheet and screeningsStructural and fire class, BIM threshold, climate requirement and planning basis on one sheet.
The phase's other documents — for example F0_11 — appear in the report as sections and appendices and are therefore not listed separately here. All 16 related documents are named, with their purpose, in the list of deliverables you get with the proposal.
The gate onwardConsultancy agreement signed, requisition and EAN received, project data sheet approved.
Phase 1 · step 1A6 weeks · 1 report + 15 documents
Concept report
- F1_02THE PHASE'S REPORTConcept reportNeeds, users, constraints and scenarios — the basis for the choice of direction at M1.
- F1_01Start-up note and stakeholder mappingWho is to be involved, and when — administration, users, committee.
- F1_05Survey of existing conditionsMeasurement and condition of the existing building, before anything is drawn.
- F1_07Compliance screeningClimate requirement, BIM order, accessibility and working environment held against the case.
- F1_10User involvementPlan and minutes — so the involvement can be documented.
- M1Direction noteScenario and sustainability level chosen and signed — triggers the step's invoice.
The phase's other documents — for example F1_12 — appear in the report as sections and appendices and are therefore not listed separately here. All 15 related documents are named, with their purpose, in the list of deliverables you get with the proposal.
Milestone M1Milestone M1: scenario and sustainability level chosen and signed.
Phase 1 · step 1B6 weeks · 1 report + 15 documents
Design brief
- F1_17THE PHASE'S REPORTDesign briefRoom programme, functional requirements, capital budget and programme — what gate F1 → F2 approves.
- F1_20Capital budget with contingencyThe budget that states for itself whether the contingency holds against the appropriation.
- F1_22Master programmeThe duration of the phases — and the political waiting times as rows of their own.
- F1_25Committee recommendationA neutral working version for your own template — without a consultant's logo.
- F1_29Brief for investigations and owner-supplied servicesGeotechnics, land surveying, certified consultants — what is ordered, and by whom.
- F1_32Approval noteGate F1 → F2, in writing.
The phase's other documents — for example F1_23 — appear in the report as sections and appendices and are therefore not listed separately here. All 15 related documents are named, with their purpose, in the list of deliverables you get with the proposal.
The gate onwardDesign brief and capital budget approved — and the committee recommendation ready for the agenda system.
Phase 25 weeks · 1 report + 11 documents
Outline proposal
- F2_01THE PHASE'S REPORTOutline proposalThe main design with drawings DF_01–DF_07.
- F2_05Preliminary energy frame41.0 kWh/m² plus supplements for anything other than dwellings — an institution never gets the housing figure.
- F2_06LCA screeningEmissions against the limit value for the building type — 8.0 for institutions.
- F2_09Cost estimateContract works and contingency against the capital budget.
- F2_12Approval of the outline proposalGate F2 → F3, in writing.
The phase's other documents — for example F2_04 — appear in the report as sections and appendices and are therefore not listed separately here. All 11 related documents are named, with their purpose, in the list of deliverables you get with the proposal.
The gate onwardMain design approved, climate screening holds, estimate within the appropriation.
Phase 37 weeks · 1 report + 16 documents
Design proposal
- F3_01THE PHASE'S REPORTDesign proposalMaterials, structure and services — the case you can apply for.
- F3_04Energy frame calculationThe calculation the municipality wants to see.
- F3_06Climate calculation (LCA)Documented emissions with a reduction track.
- F3_09BIM specification and process manualThe requirements for models and data — when the order applies, or when you choose them.
- F3_12Budget and life-cycle costCapital and operation over the lifetime.
- F3_17Approval of the design proposalGate F3 → F4, in writing.
The phase's other documents — for example F3_08 — appear in the report as sections and appendices and are therefore not listed separately here. All 16 related documents are named, with their purpose, in the list of deliverables you get with the proposal.
The gate onwardDesign proposal, energy frame and climate calculation approved.
Phase 49 weeks · 1 report + 21 documents
Building permit design
- F4_02THE PHASE'S REPORTAuthority statementThe documentation of the building as the municipality requires it — in structural class 2 and fire class 2.
- F4_01Permit application via Byg og MiljøFiled digitally with all documentation attached.
- F4_06Structural documentationCertified structural engineer as an owner-supplied service — you contract, we specify and check.
- F4_10Fire strategyCertified fire consultant — occupancy category 6 for a day-care centre.
- F4_13Climate documentationThe climate calculation in the form the application takes.
- F4_16Waste notification and infiltration permitThe side permits most often forgotten.
- F4_22Building permit reviewedConditions and deadlines — and what they mean for the tender.
The phase's other documents — for example F4_09 — appear in the report as sections and appendices and are therefore not listed separately here. All 21 related documents are named, with their purpose, in the list of deliverables you get with the proposal.
The gate onwardBuilding permit received, and the side permits in hand.
Phase 5 · step 5A6 weeks · 1 report + 17 documents
Tender design
- UDB_01THE PHASE'S REPORTTender conditions with evaluation modelDescribed in full in advance — so the model cannot be set aside under section 160 of the Danish Public Procurement Act.
- UDB_03Tender design with drawingsWhat the contractors price — the same for everyone.
- UDB_05Work specificationsTrade by trade, to the standards the contract refers to.
- UDB_08Bill of quantitiesQuantities from the design, so bids can be compared item by item.
- UDB_11Construction contract under AB 18With a labour clause — mandatory for the state, recommended for municipalities.
- M2Contract noticeSent — and it cannot be taken back. Triggers the step's invoice.
The phase's other documents — for example UDB_07 — appear in the report as sections and appendices and are therefore not listed separately here. All 17 related documents are named, with their purpose, in the list of deliverables you get with the proposal.
Milestone M2Milestone M2: the contract notice is sent. It cannot be taken back.
Phase 5 · step 5B5 weeks · 1 report + 11 documents
Tender process
- F5_29THE PHASE'S REPORTAssessment of complianceEach bid held against the tender conditions — the basis for the evaluation.
- F5_20Questions and answersSent to all bidders at the same time.
- F5_22AddendaThe only way the material may be changed after the notice.
- F5_25Bid opening — recordWho bid, what, and when — written down at the opening.
- F5_26Declaration of impartiality, second timeNow that the bidders are known.
The phase's other documents — for example F5_24 — appear in the report as sections and appendices and are therefore not listed separately here. All 11 related documents are named, with their purpose, in the list of deliverables you get with the proposal.
The gate onwardBids received and compliant.
Phase 64 weeks · 1 report + 13 documents
Award recommendation
- F6_04THE PHASE'S REPORTAward recommendationThe evaluation by the published model and our recommendation — written so it can be filed on its own.
- F6_01Evaluation reportScores and reasons by the model set out in the tender material.
- F6_05Declaration of impartiality, third timeAt the recommendation.
- F6_07Committee recommendationA neutral working version for your agenda system.
- F6_09Basis for notification and standstillWhat the authority sends to the bidders — 10 calendar days, electronically.
- F6_12Draft contractReady for signature after the standstill.
The phase's other documents — for example F6_02 — appear in the report as sections and appendices and are therefore not listed separately here. All 13 related documents are named, with their purpose, in the list of deliverables you get with the proposal.
The final gateAward recommendation delivered. The authority makes the award decision.