ENDA
Client Advisory · Design · Digital Leadership

Build on ground you can calculate.

A basis that holds in the committee — and in the tender.

SYNEGRO is the building owner's own consultant — from the first idea to the contractor you choose. We draw and design the house, calculate the energy frame and the carbon, assemble the permit application and bring the bids home, in seven phases with a gate between each one. If you need less, we review a project that stalled, deliver a single calculation at a fixed price — or put digital leadership into the build.

SYNEGRO advises municipalities, regions, the state and social housing organisations in the early phases of construction — from concept to building permit design — with named, documented deliverables, BIM management under the executive order and a pricing basis that fits into the budget year and can be used in the market survey.

01 · Tools

Try before you read.

Seven calculators that run in your browser. No sign-in, no email — and the figures never leave your screen. The first four answer what every client asks first — and tell the owner of several buildings where the portfolio stands. The last three calculate the construction itself.

Six calculators that run in your browser. No sign-in, no email — and the figures never leave the screen. The first three answer what the administration has to settle before a case can start. The last three calculate the building itself.

Calculate the fabric

The three technical calculators — the same method the municipality assesses by.

75 mm150 mm300 mm
0.20 W/m²K
Holds only the minimum of 0.30 — not 0.18 for a conversion
02 · Services

This is what we do.

The whole process, or a single task. Advisory & Design is the main service — the rest are there when you only need a piece of it.

The whole process, or a defined task. Advisory & Design is the main service — the rest can be bought separately, below the threshold.

03 · Pricing

Fixed prices. Stated incl. VAT. Before you sign.

Fixed prices. Stated excl. VAT. Before you go to tender.

Almost no consultant puts a price on their website. We do — because you are going to compare anyway, and because a price you first hear in phase 1 is a price you cannot trust.

The fee is stated so it can be entered into the budget year and used in a market survey. Payment in arrears, net 30 days, e-invoicing via NemHandel.

The price holds

The fee is a fixed percentage of the total construction sum — from 4 % for the simple to 7.5 % for the complex. If the task grows beyond what was agreed, we say so before we spend the hours — not on the invoice.

No payment up front worth the name

A start-up instalment of 6 %. The rest is paid phase by phase, once you have approved the phase. Net 14 days, and no other advance payment.

Everything is invoiced in arrears against an approved phase. Net 30 days, e-invoicing via NemHandel to an EAN number — and no advance payment.

No surprises

Geotechnics, land surveying and municipal fees are paid directly by the building owner — and we say so out loud at the first meeting, not at the third.

Insights · what applies right now

Three things that apply today — and that many people do not know.

1 July 2025Requirement

The carbon limit now applies to every new detached house

A new house must document emissions below 6.7 kg CO₂ equivalents per m² per year. The limit tightens to 6.0 in 2027 and 5.4 in 2029. A project that only just holds today will not hold in two years.

BR18 § 298 · supplementary agreement of 30 May 2024
1 April 2024Requirement

A detached house is not exempt from structural documentation

In structural class 1 the engineer does not have to be certified — but the structural basis, calculations, drawings and the structural design statement still have to exist. Certification is a requirement of the person, documentation a requirement of the paper.

BR18 s. 504(2)
Does not apply to youFree

The EU taxonomy and CSRD impose nothing on you

If you are building a detached house, neither the EU taxonomy nor CSRD requires anything of you. If you meet a consultant using the EU as leverage, ask which article.

Omnibus I · Directive (EU) 2026/47
What we do not do

We stop when the contractor has been chosen.

Our service ends with the recommendation of contractors — deliberately. We would rather be independent of those who build than manage them. And you should know that before we sign, not discover it afterwards.

  • NotSite management.The daily direction of the trades on site. If you need it, we help you find a site manager — and write the agreement with him.
  • NotTrade supervision.Checking that the work is carried out as designed. That requires someone on site — and that is not us.
  • NotHandover and the one-year inspection.The walk-through when the house is finished. It belongs with the supervision, and we let it follow it.
  • ButEverything up to that point.From the first idea to a project that is approved, priced and ready to build from — with the energy frame, carbon, permit application and tender in the same package, and specialists brought in when the case requires them.
04 · Contact

How a project starts.

Four steps from your first message to phase 0. None of them commits you until you have seen the proposal.

  1. Write or call

    Tell us briefly what you want to build, and where. We answer within two working days — including when the answer is that we are not the right firm.

  2. Clarification meeting

    30 minutes, online or at your place. No charge. You find out what a process would look like for your project — and what it would cost.

  3. Proposal and agreement

    A fee proposal with a fixed price, the list of what you get, and the payment plan. The agreement is the industry standard, written for consumers.

  4. Start-up

    The start-up note is written and phase 0 begins. From there you decide at every gate whether we carry on.

Write to us → Book 30 minutes info@synegro.dk · +45 93 60 24 30 · reply within two working days